Six weeks sounds fast for a whole villa. It is not fast; it is simply a timeline with nothing idle in it.
/ 01Weeks one and two — decide
Every finish is chosen and signed off before a single frame is cut. Changes after week two are what turn six weeks into twelve.
/ 02Weeks three and four — make
All rooms are built together, deliberately. Timber and stone from one run match; the same pieces made two months apart do not.
Building the rooms together is not efficiency. It's how the finishes match.Leyla Demir · Head of Studio, SpaceUp
/ 03Week five — stage
The residence is assembled in our workshop before it is assembled in your house, so the problems surface where we have tools.
- Sign off everything by week two.
- Build all rooms in one run.
- Dry-assemble before delivery.
- One delivery, not five.
/ 04Week six — hand over
One coordinated delivery, placement, assembly and a documented walk-through. The waste leaves with the team.